The multi-modal platform handles yearly 1.4 million tonnes of goods arriving by train, boat, or truck.
A team of 30 employees handle operations on the site: loading and unloading the transport units, stock management, reshipment, train haulage, rail delivery for local industry and more.
Major equipment
- 1 40-tonne container gantry
- 1 12-tonne bridge crane
- 1 800-tonne mobile crane for heavy and semi-heavy cargo operations
- 1 80-tonne crane
- 20 handling vehicles from 3 tonnes to 48 tonnes
- 3 trackmobiles, including 2 x 600 HP, 30 R90 type flat trucks
- 1 maintenance workshop equipped with a rail pit and a 5-tonne overhead crane
- 11,600 m² of indoor storage
- 35,600 m² of outdoor storage on coated or stabilised surfaces.